Architect fees in Morocco for overseas owners: what you pay for, what is extra, what to sign

By , architect · Updated on · Reference texts (3)

Free, no account and no contact details.

Building in Morocco while living in Paris, Brussels, Montreal or Dubai means your architect is also your eyes on site. This guide explains what an architect's fee in Morocco actually covers, what is paid on top, and what to check in the contract when you cannot be there. There is no published rate here: fees are free and set in a contract with the practice.

In short: architect fees in Morocco are freely agreed in a written contract with the practice (Law 016-89 on the architecture profession). They depend on the type of project, its complexity and above all the scope of the assignment: design and permit only, or also construction documents, tender, and site supervision until the occupancy permit. The Order no longer publishes a minimum scale. The structural engineers (BET), land surveyor, soil survey, inspection office and laboratory are paid separately. In towns, an architect registered with the Order is a condition of the building permit (Law 12-90, art. 50) and a copy of the contract is part of the permit file. For an owner abroad, the scope that matters most is site supervision.

Your budget, calculated for your project

Overall estimate by trade in 2 minutes, free and with no commitment, then a free video call with a registered architect. The detailed cost study (bill of quantities) is included in a full architectural design assignment; ordered on its own, it is paid.

Estimate my project → Start my file

📹 Free video call with the architect →

Why there is no single "architect price" in Morocco

An architect sells an assignment, not a drawing. Two owners with similar houses can pay very different amounts because one bought design and permit only, while the other bought an architect who follows the works until handover. Compare the content of the assignment before comparing amounts.

You buyYou getWhat stays with you (from abroad)
Design and permitSketches, final design, permit file filed online on Rokhas, follow-up until the decisionChoosing a contractor without common specifications, checking the works, compliance with the drawings
+ construction documents and tenderExecution details for every trade, specifications (CPS) and bill of quantities, contractor tender and bid analysisSite supervision and quality control
+ site supervisionSite visits, site reports, checking the contractor's progress claims, handover with snag list, documents for the occupancy permitYour decisions as owner and paying the contractor
+ OPC coordinationSchedule, coordination of trades, site meetings, time and budget follow-upSigning contracts and approving each progress claim before payment
Interior design (optional)Layout, materials, finishes, fitted furniture—

Legal reminder: in urban municipalities and their outskirts, the architect's statutory assignment includes following the works and checking compliance until the occupancy permit or certificate of compliance is issued (Law 12-90, art. 53). For 150 m² of floor area or less, the architect is mandatory for the design only (art. 54).

What drives the fee

Your budget, calculated for your project

Overall estimate by trade in 2 minutes, free and with no commitment, then a free video call with a registered architect. The detailed cost study (bill of quantities) is included in a full architectural design assignment; ordered on its own, it is paid.

Estimate my project → Start my file

📹 Free video call with the architect →

Know the cost of works before you negotiate

Examples from the CITURBAREA cost estimator (Kénitra, good soil, works including VAT, excluding land and fees):

ProjectCost of works incl. VATPer m² incl. VAT
100 m² house, mid-range finish622,000 DH6,220 DH
150 m² two-storey house, mid-range813,000 DH5,420 DH
150 m² two-storey villa, mid-range960,000 DH6,400 DH
150 m² two-storey villa, luxury2,184,000 DH14,560 DH

Detail in the estimator →

Figures recomputed at each site update by the same engine as /chiffrage; an estimate, not a quote. See house construction cost per m² and villa construction cost.

Building from abroad: what the architect does in your place

Who else is paid, outside the architect's fee?

ProfessionalRoleWhen neededHow paid
Architect registered with the OrderDesign, permit, coordination, supervisionAlways in townsFee in the architect's contract
Engineering consultancy (BET)Reinforced-concrete design, structural drawings, building servicesAny reinforced-concrete buildingIts own contract, negotiated
Land surveyorTopographic survey, setting outUnregistered land, setting out on siteSeparate invoice
Laboratory / soil surveySoil investigation, concrete testsStrongly recommended for every projectSeparate invoice
Inspection officeStructural inspection, fire safety noticeCases set by joint order 1032-21Separate invoice

See the engineering consultancy (BET) guide and permit fees and taxes.

Contract checklist for an owner abroad

  1. Phases included, named one by one (sketch, preliminary design, permit, construction documents, specifications, supervision, OPC).
  2. Fee basis: fixed amount or linked to the estimated cost of works; excluding or including VAT.
  3. Design revisions included, and what happens if you change the brief after the permit.
  4. Site visits: frequency or number, written reports with photos, who approves progress claims.
  5. Payment schedule phase by phase, tied to delivered documents.
  6. Exclusions: BET, surveyor, soil survey, inspection office, municipal taxes, interior design.
  7. Language and communication: contract and reports in a language you read; one point of contact.
  8. Termination: what you owe if the project stops after the permit.

The contract is not a formality: a copy is a main document of the permit file when an architect is mandatory (joint order 337-20 as amended by order 1032-21).

Paying in stages

Fees are usually spread phase by phase as set in the contract. This lets you start with a feasibility check based on the zoning information certificate before committing to the whole project, which is useful when you are still deciding between plots.

Architects on CITURBAREA

CITURBAREA is the platform published by HSE DECO. Architecture assignments are carried out and invoiced by Arc Bati Architecture (architect registered with the Order, Kénitra), presented on the platform, in the Rabat-Salé-Kénitra region, with remote follow-up for Moroccans living abroad. Its fees are set in a fee proposal and contract after reviewing your brief. See the practice page, the building permit guide and Rokhas.

Architect fees on the market: freely negotiated, public reference points

This first table contains no figure: the platform publishes no unsourced market range. It states what the texts provide and where to look.

QuestionWhat the texts and practice saySource
Who sets the fees?The contract between the client and the architect, freely negotiated. Fees pay for a defined assignment (design, permit, construction documents, specifications, supervision, OPC).Law 016-89 on the practice of the architect's profession
Is the Order's fee scale mandatory?No. It was a professional recommendation, never a legal obligation; since the settlement with the Competition Council (February 2023), the Order no longer publishes a minimum scale. Each practice is free to set its own grid.Competition Council decision (22/02/2023), CITURBAREA reference base
Do public-procurement scales apply to private clients?No. Architect contracts awarded on behalf of the State follow their own rules; they do not carry over to a private project.Decree 2-22-431 on public procurement
Is the contract part of the permit file?Yes: the copy of the architect's contract is a main document of the building-permit file where the architect is mandatory.Order 337-20 as amended by order 1032-21, point 4.1
How to compare?Ask several written proposals for the same assignment (same phases, same scope, pre-tax basis stated, exclusions listed); compare the content before the rate.Practice recommended by the firm

Fee grid of the Arc Bati Architecture practice (version of 20/10/2026)

Second table: the grid of Arc Bati Architecture SARL AU (architect registered with the Order, Kénitra), presented on CITURBAREA. These are its own terms, not the platform's nor “the market's”. The rates appear in the practice's quotation and contract, which alone are binding; the guides publish no rate.

Grid lineScopeBasisNatureTerms
Sketch and preliminary designÉtudes préliminaires et plans personnalisés : trois propositions de départ, puis modification de la proposition retenue ou combinaison de plusieurs, jusqu'à la proposition finale (3 à 5 itérations).Base assignment: percentage of the estimated pre-tax cost of works, rate in the contract; this line is a share of the base assignmentDepending on the chosen pack (Essential without, Personalised and Premium with) or as an optionInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Detailed design, cost estimate and building permitChiffrage du projet ; APD : conformité du plan de béton armé au plan d'architecte, lots techniques en APD ; constitution et dépôt du dossier d'autorisation auprès de la Commune de …, suivi jusqu'à la décision.Base assignment: percentage of the estimated pre-tax cost of works, rate in the contract; this line is a share of the base assignmentIncluded in the base assignmentInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Site supervision and controlVisites de chantier, procès-verbaux de chantier, réception des travaux.Base assignment: percentage of the estimated pre-tax cost of works, rate in the contract; this line is a share of the base assignmentIncluded in the base assignmentInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Interior designModule on top of the base assignment: percentage of the estimated pre-tax cost of works, rate in the contractDepending on the chosen pack (Essential without, Personalised and Premium with) or as an optionInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Construction documents by tradeDétails d'exécution de tous les lots (portes, fenêtres, niches, revêtements de sol et muraux…) : terrassements, gros œuvre béton armé, maçonnerie et enduits, étanchéité et isolation thermique, charpente, couverture et zinguerie, menuiserie extérieure aluminium (fenêtres, baies, façades), menuiserie intérieure bois (portes, placards), métallerie et serrurerie, cloisons et doublages, revêtements de sols, revêtements muraux et savoir-faire traditionnels, peinture, vitrerie et ravalement, plomberie sanitaire, électricité courants forts, climatisation et ventilation, eau chaude sanitaire et solaire thermique, faux plafonds, staff, stuc et plâtre sculpté (gebs), courants faibles (VDI, sûreté), espaces verts et aménagements extérieurs, voirie et réseaux divers (VRD).Module on top of the base assignment: percentage of the estimated pre-tax cost of works, rate in the contractDepending on the chosen pack (Essential without, Personalised and Premium with) or as an optionInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Detailed specifications and contractor tenderModule on top of the base assignment: percentage of the estimated pre-tax cost of works, rate in the contractDepending on the chosen pack (Essential without, Personalised and Premium with) or as an optionInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
OPC coordination (scheduling, steering, coordination)Suppose le dossier d'exécution et le CPS.Module on top of the base assignment: percentage of the estimated pre-tax cost of works, rate in the contractDepending on the chosen pack (Essential without, Personalised and Premium with) or as an optionInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Dépôt et obtention d'une nouvelle décision d'autorisationAutorisation expirée : constitution et dépôt du dossier auprès de la Commune de …, suivi jusqu'à l'obtention de la nouvelle décision.Lump sum MAD 5,000 excl. VATIncluded in the base assignmentInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Demande de permis d'habiter (total ou partiel)Constitution et dépôt de la demande auprès de la Commune de ….On quotationIncluded in the base assignmentInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Modificatif de plans sur projet autoriséMission distincte : toute modification par rapport à l'autorisation initiale (dépôt auprès de la Commune de …).On quotationIncluded in the base assignmentInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
Attestation de conformitéVisite de constat et établissement de l'attestation.On quotationIncluded in the base assignmentInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices
RégularisationDossier de régularisation déposé auprès de la Commune de ….On quotationIncluded in the base assignmentInvoiced by phase according to the contract schedule; fees excl. VAT, VAT added on invoices

Detail in the estimator →

Outside architect fees (invoiced separately by each party)

Engineering firm (reinforced-concrete drawings and calculation note), laboratory (geotechnical study, tests), licensed surveyor, control office, municipal taxes and fees for services rendered. Insurance: the practice's professional liability; CAR and ten-year building insurance taken out by the client and contractors, mandatory above MAD 5 million of works.

Assignment comparator: what does each phase include?

AssignmentProject phaseIn the base assignment?What you receive
Sketch and preliminary designEsquisse et avant-projet sommaire (APS)Yes1/200 then 1/100 drawings, options, ratio estimate
Detailed design, cost estimate and building permitAvant-projet détaillé (APD) et premières études techniquesYes1/100 and 1/50 drawings, estimate by trade, complete Rokhas file
Construction documents by tradeÉtudes d'exécutionNo, additional moduleExecution details for every trade, coordination with the engineers
Detailed specifications and contractor tenderMétré, consultation des entreprises et marchésNo, additional moduleTrade-by-trade specifications, price schedule, comparative bid analysis
Site supervision and controlPréparation et ouverture du chantierYesVisits, site reports, validation of progress statements, acceptance
OPC coordination (scheduling, steering, coordination)Terrassement, fondations et sous-solNo, additional moduleSchedule, contractor coordination, minutes until acceptance; requires the construction documents and specifications
Acceptance of works and occupancy permitRéception provisoire et levée des réservesYesAcceptance report, clearance of reservations, certificate of conformity, occupancy-permit file
Interior designSecond œuvre, équipements et extérieursNo, additional moduleLayout, materials, finishes, fixed furniture, alongside the works

Details of services, phases and schedule appear in the quotation and architect's contract offered by the practice; see the Arc Bati Architecture practice page.

Frequently asked questions

How much does an architect cost in Morocco?

There is no single price: fees are freely agreed in a contract according to the type of project, its complexity and the scope (design and permit only, or also construction documents, tender and site supervision). Ask for a written fee proposal listing included and excluded phases.

Can I hire a Moroccan architect while living abroad?

Yes. The architect can file the permit online and follow the application; RGC art. 34 allows filing by the architect or a mandated person. Agree site-visit frequency and written reports in the contract.

Are architect fees negotiable in Morocco?

Yes. They are set freely in the contract, and the Order has not published a minimum scale since 2023. Compare the content of each proposal, not just the amount.

Are the structural engineer's fees included?

No. The engineering consultancy (structure and services) has its own contract, as do the land surveyor, soil survey, inspection office and laboratory where needed.

Is an architect mandatory for a small house?

In urban municipalities, delimited centres and their outskirts, the architect is a condition of the building permit (Law 12-90, art. 50). For 150 m² of floor area or less, only for the design (art. 54).

Can the architect be paid in stages?

Yes, usually phase by phase as set in the contract: sketch, detailed design and permit, construction documents, tender, site works.

Reference texts (3)

Start my fileWhatsAppAppeler

Read next

All guides → · Standards library →

Stay informed

Material prices, new planning rules and site advice: one letter a month, written by an architect.

▶ Subscribe to the YouTube channel Channel of architect Yassine AT-TARASSI: sites, prices and procedures on video.
Create my free account →

Create your free account to continue

Supplier prices, technical data sheets and product comparison are reserved for account holders. The account is free and takes a minute.

Create my free account → I already have an account

I am a professional

Ce contenu est consultable uniquement en ligne sur citurbarea.com. هذا المحتوى متاح فقط على الموقع citurbarea.com