Structural work (gros œuvre) in Morocco in 2026: cost, quotes and paying from abroad

By , architect · Updated on · Reference texts (4)

Free, no account and no contact details.

You live abroad, or you are investing in Morocco, and a builder has sent you a quote for the gros œuvre — the structural shell of the house. This guide explains what that word covers in Morocco, what it costs in 2026 according to the CITURBAREA simulator, how to read a Moroccan structural-work quote line by line, and how to pay it in stages without being on site. Figures are recalculated whenever material prices are updated.

In short: for a two-storey (R+1) 150 m² house in Kénitra on good ground, the CITURBAREA simulator prices the structural shell alone (site set-up, earthworks, foundations, reinforced concrete, blockwork and render, roof waterproofing) at 338,822 DH excl. VAT, about 2,259 DH/m² with a general contractor. With a tâcheron (labour-only builder) and materials bought by you, it drops to about 1,598 DH/m² — but someone has to buy, receive and check those materials on site. Clay ground (raft foundation) adds about 42,000 DH. The shell is 53 % of the building works: it is the quote that deserves the most scrutiny, and the stage where remote owners lose the most money.

Detail in the estimator → · Reference prices and data sheets →

Your budget, calculated for your project

Overall estimate by trade in 2 minutes, free and with no commitment, then a free video call with a registered architect. The detailed cost study (bill of quantities) is included in a full architectural design assignment; ordered on its own, it is paid.

Estimate my project → Start my file

📹 Free video call with the architect →

What does "gros œuvre" mean on a Moroccan quote?

In Morocco the house is almost always a reinforced-concrete frame (columns, beams, hollow-block floors) filled with hollow concrete blocks and rendered with cement. Gros œuvre is everything up to a watertight shell. It does not include windows, tiles, plumbing or electrics — those are second œuvre. Builders split the shell into six packages; check that each one is on the quote:

Package (as named on Moroccan quotes)What it coversAmount excl. VAT (DH)DH/m²
00 Installation de chantier (site set-up)Site fence, temporary water and power, site hut12,65284
01 Terrassements (earthworks)Topsoil stripping, trench and pit excavation, backfill, spoil removal5,91339
02 Fondations (foundations)Blinding concrete, pad footings, ground beams, starter bars, hardcore, ground slab64,243428
03 Béton armé (reinforced concrete frame)Columns, beams, ring beams, hollow-block floors (hourdis), solid slabs, stairs, parapet123,068820
04 Maçonnerie et enduits (blockwork and render)20 cm block walls, 10 cm partitions, internal cement render, screeds104,324695
05 Étanchéité (roof waterproofing)Falls screed, two-layer SBS membrane, protection, roof insulation, upstands28,621191
Total shell53 % of the building works338,8222,259

Detail in the estimator → · Reference prices and data sheets →

Two-storey house, 150 m² of floor area, 75 m² footprint, mid-range, Kénitra, general contractor. CITURBAREA simulator, 2026 prices, recalculated at each price update.

Many Moroccan quotes move partitions, internal render and screeds into "second œuvre". The structural core alone (concrete frame and external walls) is about 1,130 DH/m². Before comparing two quotes, make sure the same packages are inside.

Contractor or tâcheron: which suits an owner who lives abroad?

Scenario (150 m² house, Kénitra)Shell excl. VAT (DH)DH/m² (150 m² above ground)Difference
Good ground, pad footings, general contractor338,8222,259reference
Average ground, strip footings357,2202,381+18,398
Clay or fill, raft foundation381,0562,540+42,234
Good ground, tâcheron (you buy the materials)239,7361,598−99,086
Good ground + 75 m² basement, 3 m deep639,1384,261+300,316

Detail in the estimator → · Reference prices and data sheets →

With a tâcheron, the 1,598 DH/m² breaks down in the engine into about 1,090 DH/m² of materials (concrete, steel, blocks, hollow blocks, cement) that you pay to the builders' merchant, about 462 DH/m² of labour (cost before the tâcheron's margin) and about 63 DH/m² of site set-up. The contractor's extra covers site overheads, employer social charges (21.09 % in the engine), general costs and a margin on materials.

For a remote owner, the saving is often illusory: materials are ordered by phone, deliveries are not counted, cement is stored in the rain, and nobody checks the steel before the concrete is poured. If you choose a tâcheron, you need someone on site who orders, receives and checks — in practice your architect, under a site-supervision assignment. A general contractor with a written quote, a programme and stage payments is usually the safer route when you are thousands of kilometres away.

Your budget, calculated for your project

Overall estimate by trade in 2 minutes, free and with no commitment, then a free video call with a registered architect. The detailed cost study (bill of quantities) is included in a full architectural design assignment; ordered on its own, it is paid.

Estimate my project → Start my file

📹 Free video call with the architect →

How do you read a Moroccan structural-work quote?

Term on the quoteMeaningWhy it matters to you
DQE / BPUBill of quantities with unit prices (détail quantitatif estimatif / bordereau des prix unitaires)Lets you compare builders line by line; a single lump sum per m² does not
SituationInterim valuation of work done, the basis of each paymentPay only situations checked against the site, never far ahead of progress
Retenue de garantieRetention kept back from each payment until handoverYour leverage to get defects fixed after completion
HT / TTCExcluding / including VAT (20 %)A quote that does not say which is not comparable
TâcheronLabour-only gang leader; you supply the materialsCheaper on paper, but you carry ordering, storage and quantity risk
B25, HA Fe E500Concrete strength class; high-bond reinforcing steel gradeMust be written on the quote, with ready-mix or site-mixed
Plans de béton arméReinforced-concrete drawings from the engineering consultancy (BET)Without them, steel quantities are decided on site

Installed unit prices to check (materials, labour, overheads and contractor margin), Kénitra, with the simulator's low-high range:

Members only

Detailed structural-work unit prices

The twelve installed unit prices to check on a quote (excavation, concrete, floors, slab on grade, blockwork, render, waterproofing), with the unit, the price excl. VAT in Kénitra and the low-high range.

Free account, newsletter and YouTube channel

These prices are built on dated, sourced material prices published in the CITURBAREA materials library: cement prices, reinforcing steel prices, block and brick prices. Labour times are engine assumptions, published on the pricing method page.

How much concrete and steel should a 150 m² house use?

Useful to sanity-check a "supply and build" quote or a delivery note you receive by WhatsApp:

MaterialWhole housePer m² of floor
Ready-mix concrete B2547 m³0.31 m³
Reinforcing steel (HA)2,559 kg17 kg
Cement, 50 kg bags (mortar, render, screeds)258 bags1.7 bag
20 cm / 10 cm hollow blocks2,869 / 1,61619 / 11
16 cm hollow floor blocks (hourdis)1,1817.9

Steel depends heavily on the ground: the engine goes from 17 kg/m² on pad footings to 27 kg/m² on a raft and about 30 kg/m² with a basement. Only the engineer's reinforced-concrete drawings give the quantities to order — see engineering consultancy (BET) in Morocco.

How do you pay for the shell in stages from abroad?

Pay by situations tied to milestones that someone you trust has seen, never by calendar date. Here are the cumulative values of the reference house (contractor, excl. VAT), to calibrate a payment schedule:

Milestone you ask to see (photos, video call, architect's report)Cumulative value excl. VAT (DH)What must be checked before you pay
Foundations poured, ground slab done82,808Bottom of excavation, reinforcement before pouring, setting-out against the permit plans
Last floor slab poured205,876Reinforcement of each slab checked against the engineer's (BET) drawings before pouring
Walls and internal render finished310,201Plumb walls, ring beams, openings where the plans put them
Roof waterproofed338,822Upstands, falls, flood test before the protective screed

Detail in the estimator → · Reference prices and data sheets →

Keep a retention until handover, insist on dated photos and a short report at each milestone, and have each situation validated by the architect before you transfer money. On CITURBAREA, situations and invoices are validated by the client before payment, and all exchanges stay on the platform. See choosing a construction company in Morocco.

Red flags on a structural-work quote

Labour rates and working days

TradeDaily rate (DH, 8 h, before charges)Days for the house (engine)
Labourer150–250161
Skilled mason (maâlem)280–45093
Steel fixer280–45015
Formwork carpenter280–45011

Detail in the estimator → · Reference prices and data sheets →

What about a 100 m² or 200 m² house, or three storeys?

House (mid-range, Kénitra, contractor)Shell excl. VAT (DH)DH/m²
100 m² of floor, R+1241,2832,413
150 m² of floor, R+1338,8222,259
200 m² of floor, R+1434,8322,174
225 m² of floor, R+2470,7832,092

Detail in the estimator → · Reference prices and data sheets →

The price per m² falls as the house gets bigger: foundations, site set-up and the roof are spread over more square metres. This matters if you are comparing a small family plot with a larger villa project.

Does the shell cost the same in every city?

City (150 m², two storeys)Contractor, DH/m²Tâcheron, DH/m²
Kénitra2,2591,598
Rabat2,5831,825
Casablanca2,5601,809
Fès2,2361,582

Detail in the estimator → · Reference prices and data sheets →

City differences come from the engine's regional coefficients for materials and labour (see the pricing method): they are estimates, not site surveys in each city.

What should you do next?

  1. Get the architect's plans and a soil investigation, then the engineer's reinforced-concrete drawings.
  2. Price the shell package by package in the simulator to have a reference.
  3. Send the same bill of quantities to three builders and compare line by line.
  4. Agree a written contract, a programme and milestone payments with a retention. For the full house budget, see house construction cost per m² and steps to build a house in Morocco.

Other published figures: Habitat Services Plus (November 2024) puts villa structural work at 2,000 to 3,500 MAD/m². Our contractor figure (2,259 DH/m²) falls inside that range; the tâcheron figure is below it because it carries no contractor overheads or margin.

Applicable standards and regulations

References ranked by precedence (Moroccan texts first). Detailed sheet: status, scope, access to the text.

All standards for "Reinforced-concrete frame" →

2026 reference prices — Reinforced-concrete frame

Public reference prices from the CITURBAREA materials library (October 2026), in dirhams excluding VAT; 20% VAT on top (incl. VAT = excl. VAT × 1.2), Rabat-Salé-Kénitra base. These are benchmarks, not supplier prices.

MaterialFrom (excl. VAT)From (incl. VAT)Range excl. VATReliability
Acier HA Fe E500 (tous diamètres)7,5 DH / kg9 DH / kg7,5 DH – 8,34 DHB
Béton de propreté / BPE B15625 DH / m³750 DH / m³625 DH – 750 DHC (indicative)
Béton prêt à l'emploi B25 (C25/30)708 DH / m³850 DH / m³708 DH – 917 DHC (indicative)
Béton prêt à l'emploi B30 (C30/37)766 DH / m³919 DH / m³766 DH – 1 042 DHC (indicative)
Bois de coffrage (bastaings, chevrons)2 083 DH / m³2 500 DH / m³2 083 DH – 3 750 DHC (indicative)
Contreplaqué de coffrage CTBX 18 mm70,83 DH / m²85 DH / m²70,83 DH – 100 DHC (indicative)
Étai métallique réglable133 DH / u160 DH / u133 DH – 209 DHC (indicative)
Fil d'attache recuit10 DH / kg12 DH / kg10 DH – 11,67 DHC (indicative)

Detail in the estimator → · Reference prices and data sheets →

24 materials for this trade in the materials library. Gros œuvre

See products, data sheets and supplier prices

Detailed offers by supplier, technical data sheets and product comparison are reserved for account holders. The account is free; no contact details are exchanged, everything goes through CITURBAREA.

Create my free account → Professional? Create my pro space

Estimate my project Book a call

Frequently asked questions

How much does structural work cost per m² in Morocco?

For a two-storey 150 m² house in Kénitra on good ground, the CITURBAREA simulator gives about 2,259 DH/m² excl. VAT with a general contractor, and about 1,598 DH/m² with a tâcheron and materials bought by the owner.

Can I build the shell with a tâcheron if I live abroad?

Only if someone you trust orders, receives and checks the materials and the reinforcement on site — usually the architect under a site-supervision assignment. Otherwise the saving is often lost in waste, missing deliveries and rework.

How should I pay for the structural work from abroad?

By situations tied to milestones checked on site: foundations, last slab, blockwork, waterproofing. In the reference house, the cumulative value is about 83,000 DH at foundations and 206,000 DH at the last slab. Keep a retention until handover.

How much steel does a house need?

About 17 kg of reinforcing steel per m² of floor on pad footings, 27 kg/m² on a raft. Only the engineer's drawings are binding.

What share of the total does the shell represent?

About 53 % of the building works of a mid-range house, partitions, render and screeds included.

Are Moroccan quotes excluding or including VAT?

Both exist. Ask for prices excluding VAT (HT) with VAT at 20 % added separately, so that quotes can be compared.

What does a basement add?

For a 150 m² house, a 75 m² basement 3 m deep adds about 300,000 DH excl. VAT to the shell: excavation, retaining walls, drainage, below-ground waterproofing and an extra slab.

Reference texts (4)

Start my fileWhatsAppAppeler

Read next

All guides → · Standards library →

Stay informed

Material prices, new planning rules and site advice: one letter a month, written by an architect.

▶ Subscribe to the YouTube channel Channel of architect Yassine AT-TARASSI: sites, prices and procedures on video.
Create my free account →

Create your free account to continue

Supplier prices, technical data sheets and product comparison are reserved for account holders. The account is free and takes a minute.

Create my free account → I already have an account

I am a professional

Become a member, for free

Three steps, only once. After that, the members-only content of every guide opens here, without reloading the page.

  1. 1. Create an account or sign in

    The account is free. After signing up, you come back to this guide.

    Create my free account → I already have an account I am a professional

  2. 2. Subscribe to the newsletter

    Tick the box to give your consent, then confirm.

  3. 3. Subscribe to the YouTube channel

    CITURBAREA cannot check a YouTube subscription: your statement is recorded with your account.

    ▶ Subscribe on YouTube

Ce contenu est consultable uniquement en ligne sur citurbarea.com. هذا المحتوى متاح فقط على الموقع citurbarea.com