Building a swimming pool in Morocco: water law, pool lighting standard and checks

A swimming pool in Morocco has a short list of binding texts. Law 36-15 on water matters as soon as the pool is filled from a well or borehole, or when backwash and emptying water are discharged. The only mandatory product standard in this package is NM 06.7.090, which covers luminaires for swimming pools and similar uses. The pool equipment series (NM EN 13451) and the pool safety standards for design and operation (NM EN 15288-1 and -2) are homologated: they become binding through the specification, and are especially relevant for pools shared by residents or open to guests.

Scope

The page covers in-ground pools of villas, residences and small hotels: the reinforced concrete or other shell, waterproofing and finish, skimmers, inlets and main drains, filtration and treatment plant, underwater lighting, edge coping and surrounding deck, and the safety arrangements against drowning.

It starts once the pool is designed with the structural engineer and the location of the plant room is fixed, and ends when the filtration is commissioned and the user has been trained. The building's general drainage and the garden paving are part of external works.

Regulatory table

Reference, edition, status, the text that makes the rule mandatory and the verified source (standards catalogue 2026-10-25; NM statuses checked against the official list of the Ministry of Industry and Trade).

ReferenceEditionStatusText making it mandatorySourceNote
Loi n° 36-15
Loi relative à l'eau
version consolidée du 18/07/2024 (adala)mandatoryThe text itself (published in the Official Bulletin)full textWater law: authorisation for wells and boreholes used to fill the pool, and conditions for discharging pool water.
NM 06.7.090
Luminaires - Règles particulières - Luminaires pour piscines et usage analogues
NM 06.7.090-2003mandatoryDécision/arrêté d'homologation n° 379-03MCINET listMandatory standard for pool luminaires; every underwater light must come with proof of conformity.
NM EN 15288-1
Piscines Partie 1 : Exigences de sécurité pour la conception
2019approved—IMANORHomologated safety requirements for the design of swimming pools, a strong reference for shared pools.
NM EN 15288-2
Piscines Partie 2 : Exigences de sécurité pour le fonctionnement
2019approved—IMANORHomologated safety requirements for the operation of swimming pools.
NM EN 13451-1
équipement de piscine Partie 1 : Exigences générales de sécurité et méthodes d'essai
2019approved—IMANORHomologated general safety requirements for swimming pool equipment.
NM EN 13451-2
équipement de piscine Partie 2 : Exigences de sécurité et méthodes d'essai complementaires propres aux echelles verticales, aux echelles a inclinaison et aux mains courantes
2019approved—IMANORHomologated: additional requirements for ladders, stepladders and handrail bends.
NM EN 13451-11
équipement de piscine Partie 11 : Exigences de sécurité et méthodes d'essai complementaires propres aux fonds de bassins mobiles et cloisons mobiles
2019approved—IMANORHomologated: movable pool floors and bulkheads, for special installations.

Materials and documents to request

MaterialStandardsSupporting documentsBasis
Underwater pool lightsNM 06.7.090Conformity marking of the luminaire for pool use; supply through a safety transformer as designed by the electrical engineer.Legal obligation
Pool fittings (skimmers, inlets, drains, ladders)NM EN 13451-1, NM EN 13451-2Product documents citing the equipment standards when the CPS requires them; anti-entrapment drain covers.Specification (CPS) requirement
Shell concrete and reinforcement—Same evidence as for the structure package: steel certificates, concrete delivery notes and reinforcement inspection before casting.Specification (CPS) requirement

Who does what

PartyRole
Client (owner)Decides on the pool and its water source, applies for any borehole authorisation and organises supervision of children.
ArchitectPlaces the pool, plant room and safety barrier on the plot and coordinates finishes and surrounding deck.
Structural engineerDesigns the shell, considering the soil, groundwater and loads, and specifies the waterproof concrete.
Pool contractorBuilds or fits out the pool, installs hydraulic and electrical equipment, tests and commissions the filtration.
Electrical engineerDesigns safety extra-low voltage supply, equipotential bonding and protections around the pool.

Inspection milestones

  1. Detailed design (APD), calculation notes and consultants' drawings approved Good practice
    Pool size, water source, plant room and safety device fixed with the detailed design.
  2. External works, plot drainage and pool Specification (CPS) requirement
    Shell reinforcement inspected before casting, raw shell watertightness test, hydraulic pipes pressure-tested, extra-low voltage and bonding checked, anti-drowning device installed, filtration commissioned.
  3. Equipment installed and tested Specification (CPS) requirement
    Pumps, filter, treatment and lights operated together, with the user present for training.
    Standards to check at this milestone: NM 06.6.071
  4. Pre-handover inspection (OPR) Good practice
    Finishes, coping and deck inspected; leaks, loose tiles and missing covers recorded before acceptance.

Common non-conformities and follow-up

FindingAction
Water level drops in the raw shell during the watertightness test.Search for the leak, repair as defined by the structural engineer and repeat the test before finishes.
Pool light supplied at mains voltage without a safety transformer.Pool put out of use, supply redesigned and rewired at extra-low voltage, then tested.
Main drain cover not of an anti-entrapment type.Replacement before the pool is filled for use.
No barrier or other safety device against drowning at handover.Installation of the device chosen with the client before the pool is put into service.

Frequently asked questions

Which standard is mandatory for a pool in Morocco?

Only NM 06.7.090, for pool luminaires. The pool equipment and pool safety standards are homologated and apply when the specification cites them.

Can I fill my pool from a borehole?

Wells and boreholes fall under Law 36-15 on water and require authorisation. Check with the competent water authority before drilling.

Is a safety barrier required?

The catalogue lists no Moroccan regulation imposing one for private pools, but a safety device against drowning is strongly advised and often written into the specification.

Why test the shell before tiling?

A leak found after tiling means removing the finish. The raw shell test shows whether the concrete itself is watertight.

Who designs the pool structure?

A structural engineer, taking the soil report and groundwater into account, as for any reinforced concrete structure.

Sources, author and revisions

Written by , architect · under review · updated . Professional reading, separate from the text of the standard: each requirement is classed as a legal obligation, a specification (CPS) requirement or good practice.

Revision log

All standards for this trade (51)

In short: for the "Swimming pool" trade, the library lists 1 Moroccan regulation(s), 1 mandatory Moroccan standard(s), 10 approved NM and 1 foreign reference(s) used as equivalents.

Moroccan regulations (1)

Mandatory Moroccan standards (NM) (1)

Approved Moroccan standards (NM, voluntary) (10)

Other jurisdictions (equivalents) (1)

Cross-cutting texts (all trades) (38)

2026 reference prices — Swimming pool

Public reference prices from the CITURBAREA materials library (October 2026), in dirhams excluding VAT; 20% VAT on top (incl. VAT = excl. VAT × 1.2), Rabat-Salé-Kénitra base. These are benchmarks, not supplier prices.

MaterialFrom (excl. VAT)From (incl. VAT)Range excl. VATReliability
Anti-algues AstralPool 5 L19,16 DH / L22,99 DH / L19,16 DH – 19,17 DHC (indicative)
Boîte de connexion (projecteur de piscine)166 DH / u199 DH / u166 DH – 167 DHC (indicative)
Bonde de fond carrée (AstralPool)170 DH / u204 DH / u170 DH – 171 DHC (indicative)
Bouche de refoulement réglable ABS à coller Ø5040,83 DH / u49 DH / u40,83 DH – 40,84 DHC (indicative)
Chlore en poudre 90° Swim-in-clear 5 kg37,5 DH / kg45 DH / kg37,5 DH – 37,5 DHC (indicative)
Chlore lent galets 200 g AstralPool Long Chlor Plus, seau 5 kg70,83 DH / kg85 DH / kg70,83 DH – 70,84 DHC (indicative)
Chlore liquide 36° Swim-in-clear 20 L10,37 DH / L12,44 DH / L10,37 DH – 10,38 DHC (indicative)
Chlore poudre AstralPool 5 kg44,83 DH / kg53,8 DH / kg44,83 DH – 44,84 DHC (indicative)
Coffret classique PF 10 (piscine)1 000 DH / u1 200 DH / u1 000 DH – 1 000 DHC (indicative)
Coffret électrique de piscine pour pompe 1 à 1,5 CV monophasée 220 V (horloge, protection thermique)1 124 DH / u1 349 DH / u1 124 DH – 1 125 DHC (indicative)

Detail in the estimator → · Reference prices and data sheets →

61 materials for this trade in the materials library. VRD & extérieurs

See products, data sheets and supplier prices

Detailed offers by supplier, technical data sheets and product comparison are reserved for account holders. The account is free; no contact details are exchanged, everything goes through CITURBAREA.

Create my free account → Professional? Create my pro space

Estimate my project Book a call

Library maintained by CITURBAREA, construction and architecture platform in Morocco · tools for architects.

All trades

Site set-up · Earthworks · Foundations · Retaining walls & basement · Reinforced-concrete frame · Masonry · Waterproofing · Thermal insulation · Renders & screeds · Façades · Aluminium exterior joinery · Interior wood joinery · Metalwork, railings · Suspended ceilings, plaster · Floor finishes · Wall finishes (tiles, zellige) · Painting · Plumbing & hot water · Sanitary fixtures · Electrical (power & low current) · HVAC · Lift · Fire safety · Solar thermal & PV · Site works & landscaping

Does your project comply with these texts?

A registered architect checks your project's compliance, from building permit to handover. Free overall estimate, first call with no commitment.

Estimate my project → Book a free video call Create my free account

Stay informed

Material prices, new planning rules and site advice: one letter a month, written by an architect.

▶ Subscribe to the YouTube channel Channel of architect Yassine AT-TARASSI: sites, prices and procedures on video.
Create my free account →

General information based on official texts: it does not replace a review of your own file. — , architect · Arc Bati Architecture

Create your free account to continue

Supplier prices, technical data sheets and product comparison are reserved for account holders. The account is free and takes a minute.

Create my free account → I already have an account

I am a professional

Ce contenu est consultable uniquement en ligne sur citurbarea.com. هذا المحتوى متاح فقط على الموقع citurbarea.com